monolithic pour vs. downpour

pouring last 4" over insulation

 Insulation within 3" of edge of forms
 Mohler Sand and Gravel feeds the RK line pump out of Otis, OR. 
Jeff Pemberton -- almost there

olivier monolithic pour plans - aka: thickened edge
5 sack concrete add calcium, fibreglass and hot water.  line pump to get down the hill.  pour mud up to the top of the gravel - float pink board insulation, then pump 4" mud for finish grade.